Building on 20 years of experience in providing tools and resources that help integrators become more successful, D-Tools Cloud is an easy-to-deploy web-based SaaS application that intelligently guides users from sales pipeline management to quoting, system design, and procurement. D-Tools will be revealing several critical new features at CEDIA Expo:
-
Enhanced Search Experience – Faceted navigation offers maximum flexibility in product retrieval. Entering a search term for a product’s category, brand, description or model number will instantly guide users to any related information and relevant results.
-
Plan Views / Drag and Drop Quoting – Browser-based design – upload floorplans and drag items (products, packages, allowances) into place to build a quote on-the-fly. System designs can be reviewed in realtime, providing a visually-rich experience for potential clients.
Line Connections – Browser-based line drawings enable visualization of the system layout by showing connections between components and devices, simplifying the integrator’s explanation of a system design to clients.
-
Drawing Synchronization – Users are offered the option to draw the system first and have the bill of materials auto-generate in the process.
-
Client Mode – Create quotes and review them with clients in real-time while hiding sensitive information such as product cost and margin.
-
Mobile Responsive – Experience the full capabilities of D-Tools Cloud from any iOS or Android web-enabled mobile device.
-
Enhanced Proposal Options – Preview, edit and share interactive multi-media proposals featuring videos, photos, testimonials, drawings and more from a single, user-friendly interface.
-
Change Orders – Easily make changes to accepted proposals, create multiple persistent change orders, present them to clients for approval, and track pending and approved change orders – from initial contract through project completion.
-
Integrated, real-time pricing with ADI and Savant – Direct data feeds, initially from Savant and ADI, provide access to real-time, dealer-specific product pricing from within the D-Tools Cloud environment for a fully integrated and streamlined proposal generation and purchase order creation experience.
For additional information and pricing on D-Tools Cloud, and to sign up for a free trial, visit www.d-tools.com/cloud.
CEDIA Expo 2019 attendees are encouraged to visit D-Tools in booth #1343 for a live demonstration of D-Tools Cloud.